24/10/2024 | Fulltime | Dublin | CV-LibraryMilestones, and communicating effectively with other teams on-site (e.g., general contractor, site manager). ▪ Look for signs of delays or bottlenecks and assess whether these are due to the subcontractor’s inefficiency or external factors (e.g., material delays, weather conditions). - Post-Visit Reporting
Save for later10/10/2024 | Fulltime | | United Kingdom | CV-Library | €320 - €340 To guarantee no delays are caused due to reinforcement drawings not being available or status A when required. Ensuring optimal constructability - Constructability is a substantial factor to be considered when detailing reinforcement as it can save immense amount of time on the project. To detail
Save for later