22/04/2024 | Fulltime | Waterford | CV-LibraryThat all materials incorporated into the permanent work, and all workmanship are executed in accordance with the applicable specification as set out in the works requirements and that required testing is carried out. Monitoring and reporting on works being carried out to the Employer's Requirements
Save for later09/04/2024 | Fulltime | Waterford | CV-Library | €25,000 - €29,000 / Year Inspect all incoming goods and materials for physical damage and appropriate documentation •Accept aircraft components and materials in accordance with internal IT system requirements (Aerotrac). •Log all incoming goods and aircraft components on the internal IT systems (Aerotrac) •Ensure rejected goods
Save for later